Please use the below scope of work to complete the google form linked on this page
Small Red Area: 6,399.10 Sqft
Large Purple Area: 22,651.20 Sqft (ALTERNATE SCOPE)
Dumpster Pads (Highlighted yellow on map)
Dumpster Pad 1: 330 Sqft
Dumpster Pad 2: 330 Sqft
Dumpster Pad 3: 164 Sqft
Main Scope of Work:
Mill & Pave 4" Depth (Small Red Area)
1. The area under consideration comprises approximately 6,399.51 square feet. (see map for area highlighted red)
2. Mill pavement to the depth of 4 Inches.
3. All repairs to be shaped symmetrically where possible.
4. Millings and debris will removed from job site area and hauled to proper recycling center. Work area will then be swept and blown clean.
5. Install 2.5 inches of compacted thickness asphalt leveling course
6. Apply asphalt bond coat SS-1H evenly on all surfaces to be paved.
7. Install 1.5 inches of compacted thickness surface asphalt
8. All areas will be barricaded during and after the repair process.
Restriping:
Restripe lot to existing layout
Concrete Dumpster Pad - 1
Remove and replace concrete dumpster pad approximately 330 sqft (see map for area highlighted yellow and labeled 1)
1. Area will have the perimeter saw cut and excavated to a depth of 8". Form, place and finish to match existing concrete with 4,000 psi concrete.
2. Barricading: All areas will be barricaded before, during and after the project.
3. Removal and clean up
Concrete Dumpster Pad - 2
Remove and replace concrete dumpster pad approximately 330 sqft (see map for area highlighted yellow and labeled 2)
1. Area will have the perimeter saw cut and excavated to a depth of 8". Form, place and finish to match existing concrete with 4,000 psi concrete.
2. Barricading: All areas will be barricaded before, during and after the project.
3. Removal and clean up
Concrete Dumpster Pad - 3
Remove and replace concrete dumpster pad approximately 164sqft (see map for area highlighted yellow and labeled 3)
1. Area will have the perimeter saw cut and excavated to a depth of 8". Form, place and finish to match existing concrete with 4,000 psi concrete.
2. Barricading: All areas will be barricaded before, during and after the project..
3. Removal and clean up
Below is an alternate scope of work we are considering. Please use the map provided below for this scope
Mill & Pave 4" Depth (Large Purple Area) (ALTERNATE OPTION)
1. The area under consideration comprises approximately 22,651.20 square feet. (see map below for area highlighted purple)
2. Mill pavement to the depth of 4 Inches.
3. All repairs to be shaped symmetrically where possible.
4. Millings and debris will removed from job site area and hauled to proper recycling center. Work area will then be swept and blown clean.
5. Install 2.5 inches of compacted thickness asphalt leveling course
6. Apply asphalt bond coat SS-1H evenly on all surfaces to be paved.
7. Install 1.5 inches of compacted thickness surface asphalt
8. All areas will be barricaded during and after the repair process.
Restriping:
Restripe lot to existing layout
Submit Bids by: 05/25/2025